DC SUSTAINABILITY
DISTRIBUTION CENTERS
SITE SELECTION - LEVEL 2 & 3
OPTIONAL: Sensitive Land Protection
- Comply with LEED credit Sensitive Land Protection
- Locate the project on previously developed land OR land that does not meet the criteria for sensitive land
- Sensitive lands include prime farmland, floodplains, habitat, water bodies, and wetlands
- Prioritize sites with opportunities to nourish and increase biodiversity
- Refer to Nike’s
DC Location Standards
OPTIONAL: Sub-Metering Capability
- Locate your project in an existing building that is set up such that your project can independently meter energy (electricity, natural gas, etc.) and water consumption
- Ensure that energy and water usage is being tracked on all projects
- Further instructions on sub-metering requirements are located in the
Energy and
Water category
OPTIONAL: HVAC&R with No or Low-Impact Refrigerants
- Once a building is electrified, refrigerants are the number one source of scope 1 carbon emissions. Selecting a building for your project that has no or low-impact refrigerants can help to drastically lower your project’s carbon emissions.
OPTIONAL: Capability for Nike to Manage Utilities
- The ability for Nike to manage our own utility bills will provide more transparency and help us track our energy, water and waste usage. By tracking these end uses accurately, we can make sure we are on track to achieve Nike’s sustainability goals.
OPTIONAL: Assessment and Planning for Resilience
- Comply with LEED pilot credit Assessment and Planning for Resilience
- Work alongside Nike’s Global Resilience Team to identify and plan around potential site hazards
- Work alongside Nike’s Business Continuity Team to develop a continuity plan
- Assess opportunities for site to be independent from external energy grids.
- Refer to Nike’s DC Location Standards
